XS Wireless GPS Dog Collar for Hunting – Real-Time Location Tracker with Long-Range Coverage

★★★★★ 5.0 97 reviews

US$30.73
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by www.kinderaerztin-schubert.de
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$30.73
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Jul 31
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by www.kinderaerztin-schubert.de
Free 30-day returns Details

Product details

Management number 231070457 Release Date 2026/06/18 List Price US$30.73 Model Number 231070457
Category

Keep your hunting dog safe and easy to locate with this Wireless GPS Tracking Collar for Hunting Dogs (Size: XS). Designed for lightweight comfort and durability, this smart GPS tracker lets you monitor your pet’s real-time location directly from your smartphone or computer—anytime, anywhere in the world. Ideal for active and hunting dogs, the collar provides reliable tracking so you can visualize and record your pet’s movements throughout the day. A data service subscription of only $8 per month per device ensures continuous and accurate GPS updates, giving you peace of mind while your dog enjoys the outdoors.

  • ‌Features:
  • Lightweight & Comfortable Design: Crafted with premium breathable mesh, this GPS-enabled tracking harness ensures your pet’s comfort while providing reliable real-time location tracking. The lightweight design is suitable for tiny, small, medium, large, and even extra-large breeds of dogs and cats. Available in six fully adjustable sizes (XS, S, M, L, XL, XXL) for a perfect fit.
  • Easy Setup & Quick Start: Setting up your GPScards® Pet Tracker is simple! Just charge the harness, activate your GPScards® service, attach it to your pet, and start tracking instantly. Whether your furry friend is roaming the neighborhood or exploring the outdoors, you can track from anywhere in the world using your smartphone or computer.
  • Real-Time Tracking on Mobile App: Stay connected with your pet through the GPScards® Mobile App, available for Apple and Android. View your pet’s real-time location on Google Maps™, access location history, and receive smartphone alerts if your pet leaves a set area, moves, parks, speeds, or has a low battery. Get full control of your pet’s GPS tracker from your phone anytime, anywhere.
  • Track from Your PC or Laptop: Prefer using your computer? No problem! The GPScards® web platform offers the same great tracking features as the mobile app. Easily monitor your pet’s activity, set up email or pop-up alerts if your pet escapes, and follow their movements directly from your browser.
  • Affordable Pay-As-You-Go Service: Enjoy the lowest monthly rate in the industry — just $8 per device, billed month-to-month. No contracts, no cancellation fees, and no need to contact support — simply start, stop, or pause your service anytime from your GPScards® account.
  • Extended Battery Life: A 1-hour charge powers up to one week of continuous GPS tracking. Perfect for travel or long adventures, this feature ensures you can track your pet anywhere in the U.S. or worldwide, making it ideal for service animals and frequent travelers.
  • No-Pull, No-Choke Comfort Harness: Unlike heavy GPS collars, this ergonomic mesh harness is designed for your pet’s comfort first. Its no-pull, no-choke design ensures even weight distribution across the chest, neck, and back—minimizing discomfort whether your pet is sitting, playing, walking, or running. The upper-body GPS placement also ensures stronger GPS reception and more accurate tracking.
  • Secure Pocket Design: The harness features a lockable pocket to keep your GPS tracker safely secured even while your pet runs, jumps, or swims. The pocket is easy to access for recharging the device and can even store small essentials like poop bags.
  • Powered by Google Maps™: Track your pet’s every move with Google Maps™ integration — complete with Satellite View, Street View, Hybrid Map, and Local Traffic updates. View nearby businesses, street names, and points of interest (POIs) to easily locate your pet’s position in real time.
  • Fits All Breeds & Easy Size Exchange: Every harness is adjustable by about one size up or down, ensuring the perfect fit. If you accidentally choose the wrong size, we’ll send you a replacement at no extra charge.
  • Proudly Made in the USA & Price Match Guarantee: As a small American business, we take pride in our craftsmanship, transparency, and value. If you find a lower-priced GPS tracking service, we’ll match it — guaranteed
  • Specifications:
  • Material: Durable, breathable polyester
  • Features: Global coverage, low battery consumption, smart alerts, no setup required
  • Functions: Lightweight comfort pet harness with real-time instant GPS tracking
  • Recommended Use: Dog and cat tracking, pet monitoring, and animal GPS tracking
  • Installation Type: Ready to use out of the box
  • Battery Type: Korean lithium battery (real 1200mAh capacity)
  • Battery Life: Up to 9 days (1-week average use)
  • Charging Time: Full charge in 2 hours
  • Tracking History Storage: Up to 1 year, with export option
  • Connectivity: 4G LTE CatM1 network with coverage in 194 countries
  • Satellite Networks: GPS L1 Band, GLONASS L1 Band, Galileo E1B/L1 for high accuracy
  • Compatibility: Windows, Mac, iPhone, Android, iPad/Tablet (App included)
  • Control Access: Track via mobile app or computer system
  • Waterproof Rating: IP66 – dustproof and water-resistant
  • Pet Harness Sizes: XS – fits cats (Siamese/Shorthair) and small dogs (Pomeranian)
  • Weight: Lightweight at only 6 ounces
Size XS
Pet collar type Safety Pet Collars
Material Polyester
Features Waterproof, Adjustable
Color Black
Brand Shivooo
Animal type Dog, Cat
Animal lifestage All Lifestages
Has written warranty No
Power type Battery
Compatible devices iPhone, Android, iPad/Tablet

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

5 out of 5
★★★★★
97 ratings | 40 reviews
How item rating is calculated
View all reviews
5 stars
90% (87)
4 stars
0% (0)
3 stars
0% (0)
2 stars
0% (0)
1 star
10% (10)
Sort by

There are currently no written reviews for this product.